... is the process proven?
We successfully operated a commercial pyrolyzer for 15 years in Redwood City, California and sold continuous power to PG&E, the largest power provider in California.
EBASCO Services, a premiere power/industrial engineering firm, evaluated the Redwood City operation and confirmed, not only all the technical aspects, but that we were the only company to have developed a reliable, continuous mass feed and cost efficient pyrolysis technology.
Pure Energy Systems Inc (PES) was established to design, build, and operate commercial pyrolysis plants.
GE Energy performed compatibility and efficiency studies on the PES clean renewable energy RNG to be used in their turbines and will provide performance guarantees for megawatt output and emissions.
"Shelf Ready” GE Energy 30 & 100 megawatt renewable energy power plants using only human generated waste can be on-line in months.